News

10th January 2024

Fullers Finer Furniture - Excellence in quality and service throughout the years.

 

One of the last deliveries of 2023 was to Boston Spa Methodist Church in West Yorkshire. The order was for a communion table in golden oak, finished with a cross made in a mixture of steamed beech and ash, to match existing furniture.

This was the third order from Boston Spa Methodist Church, previous orders comprising a York Lectern in 2017 and a matching adjustable height lectern in 2019. The furniture blends seamlessly with the existing fabric of the building and exemplifies Fuller's commitment to provide ongoing, quality products and service.

 


 

29th November 2023

Corporate Livewire. Global Awards 2023/24. Bespoke Furniture Manufacturer of the Year!

The team from Fullers were delighted to attend the awards ceremony held  at the  Coldra Court Hotel, Newport on 23rd November 2023 to be presented with the Global Award for Bespoke Furniture Manufacturer of the Year.

Focusing on excellence in design, build and customer service, with an ever expanding customer base and portfolio Fuller's were proud to pick up their latest award.

 

 

 


25th October 2023

 

Mission accomplished in Grade 1 listed, historic Sherborne Abbey, with the installation of cabinets designed and built to conceal unsightly modern electrics, in accessible cupboards, which discretely blend with their ancient surroundings.

Fullers have recently completed this project, which involved the design and installation of two tall oak cabinets, with panelled doors to conceal the electrics housed in this area of the ancient Abbey.

 

The cabinets made in a combination of veneered and solid European oak sit either side of an ancient door with a top centre section over the door. The top section has a removable access panel on magnetic catches and is machined with recessed finger pulls. The left hand side has a removable top panel with a brass hatch, ring pull handle for access to the cabling.

The cabinets are finished in a medium oak stain and polished in a clear satin lacquer to blend with the existing wood in the building.

When a member of the clergy team at Sherborne Abbey commented that the cupboards looked as if they had always been there, it was, a welcome compliment, confirming the mission as set, had been accomplished.


 

11th October 2023

We have recently had the pleasure of visiting the Isle of Man to deliver a set of furniture to the Salvation Army, for their brand new building. The set consisted of a York lectern, Holiness Table, two Mercy Seats and an AV Cabinet, all finished in European Oak. 

The largest piece was the AV Cabinet designed to the exact specification of the client and matching in with the other furniture supplied.

The York Lectern with its contemporary finish and  decorative arch bearing the Salvation Army Logo, together with the matching Holiness Table are perfectly designed to serve the modern building.

Each Mercy Seat is  finished  with a kneeler pad, in a fabric to match that on the chairs in the building.


 

14th August 2023

Bespoke Furniture Specialist of the Year 2022 /23 

South West England Prestige Awards

 

Fullers Finer Furniture are delighted to announce that they have been awarded the Bespoke Furniture Specialist of the Year Award in the South West England Prestige Awards, for the third year in succession.

"A great achievement as we rarely have winners recognised consistently." Daniel Jones, Awards Manager

The trophy was presented at Clevedon Hall Estate, Clevedon, Somerset on 25th July 2023. This beautiful venue is just a few miles from Fuller's base in Weston-super-Mare, this meant all the team were able to attend and were  treated to a celebratory dinner afterwards. 

 

 


 

31st July 2023

State of the art AV Cabinet for listed building in Somerset.

Fullers were delighted to design, build and fit a bespoke AV Cabinet and plinth for this Grade 2  listed church in Somerset. The  cabinet  and plinth were designed to match with furniture previously supplied by Fullers. Seamlessly managing to complement the architectural style and structure of the building,  whilst providing a smart, aesthetically pleasing, functional housing for the most modern technical equipment.

 


15th June 2023 

 Check out this clever bespoke storage for collapsible tables - practical, neat and beautifully crafted!!

Each cabinet designed and built to accommodate the appropriate size and number of tables. Fitted with braked castors for safety and ease of movement, finished to match the decor of the building. Beautiful solutions for everyday practicality.

 


19th April 2023 - Creative restoration and updating for a long established local family business.

 

Rossiters was established in 1832.  Owned and run by members of the Rossiter family ever since, their business model, based on  integrity, knowledge and trust continues to this day. Recognising the need for some modernisation Fullers were commissioned to design and build new shop windows for the Weston-super-Mare store. The shops windows were re-designed with new oak shelves and state of the art LED lighting to show the window display at it's very best.

 


 

20th March 2023 - Showcasing purpose built AV Cabinet.

 

 A bespoke AV cabinet designed and built for St Leonard's Church, a beautiful listed building in the parish of Beoley, Worcestershire.  The specification was for an AV Desk in a natural oak finish specifically designed with a desk section which would neatly cantilever over the existing pews. Supplied with a plinth and chrome legs to match those on the bellringers balcony.

 

 


20th February 2023 - Custom made AV Cabinet

 

February saw the completion of work to design, supply and fit a new A/V desk and plinth at Christ Church Little Heath. The A/V cabinet was completed in a natural ash finish, the plinth was also finished with natural ash risers and solid oak nosing on two edges, together with a smart and practical carpet tile top.

 

The ash finish designed to match a further order from the client for bespoke, hand crafted furniture consisting of two lecterns and a nave altar.

 

 

AV technical installation by Cunnings Recording Associates.

                                                                 

 


 

 

23rd January 2023 - Bespoke matching servery and altar table.

 servery to match the previously supplied altar table, intelligently crafted to optimise state of the art equipment, exquisitely  designed  to be in keeping with the church architecture  which dates back to medieval times.   

This work was carried out recently by Fullers In St Peter’s, Church Welford. A project which showcases the design and build skills of this remarkable award winning company. 

 

 

 

 


 

 

5th  December 2022 - Fullers prestige tables, stylish and contemporary.

 

 

 

 

 

All options are on the table with award winning furniture manufacturers Fullers. Designers of bespoke tables of various shapes and sizes fit for every occasion, building and style.

 

 

 

 

 

Whether looking for something very traditional or ultra modern, see your ideas transformed into something truly unique, designed and crafted with the remarkable  skill and care that sets Fullers apart. 

 

 

 

 

 


2nd November 2022 - Bespoke woodcrafting designed to serve and complement Grade 2 listed building.

During October Paul, Oliver and the team spent time at the beautiful LLandogo Church in Monmouth, fitting a new servery area. The Church is a Grade 2 listed building built  between1859 and 1861.

The servery included a sink, undersink water heater and storage cupboards,The carcases were finished in a golden oak stain with panelled solid oak frame doors and hard wearing laminate surfaces. The servery facias  were fitted with a  tongue and groove oak panelling, designed and finshed to blend perfectly with the exisitng pews. All units are finished in a durable , easily maintained satin finish laquer.

 

             

 

 

 

 

 

 

 


 

1st October 2022 - Celebration and innovative crafting!!

CONGRATULATIONS

to Oliver and Katie.

Congratulations to Oliver and Katie on their wedding which  place on 1st October 2022.  The ceremony took place at Clarence Park Baptist Church. Weston-super-Mare followed by a reception and evening celebrations at  Court Farm Country Park. Paul Fuller put his wood crafting skills to good use in creating a rather special stand for the wedding cake.  We all wish Oliver and Katie all the very best in their future together.

Powered by Business Edit